Ash accumulation inside of boiler region prior to use of SHOCKSystem™.
[1]
2
3
4
5
Close
After a few shots with the SHOCKSystem™, the top of first ash pile has been knocked down.
1
[2]
3
4
5
Close
With the first ash pile removed, the SHOCKSystem™ begins to dismantle the second pile.
1
2
[3]
4
5
Close
Only a trace of the second pile remains after additional shots with the SHOCKSystem™.
1
2
3
[4]
5
Close
More shocks have reduced the second pile to mere rubble.
1
2
3
4
[5]
Close