The SHOCKSystem™ successfully removed "flags" off of pendant leading edges and sticky "coral slag" and platenization off of pendant tubes.
SHOCK STORY: SUPER HEAT SLAG REMOVAL
Current Situation:
600 MW Boiler
Burns 100% Powder River Basin (PRB) Coal
Slag builds up on the leading edges of Superheat Pendants
Solution:
Demonstrate a single combustor in the "saddle" area of the Superheat Pendants
System Design:
One single SHOCKSystem™ sootblower was installed
Performance:
Removed slag "flags" off of pendant leading edges both line-of-sight and non-line-of-sight
Removed sticky "coral slag" and platenization off of pendant tubes
The SHOCKSystem™ satisfied the goals and expectations for this demonstration
Bottom-Line Impact:
Lead to an installation proposal
Results: Removed Slag Flags And Coral Slag From Pendants
Before SHOCKSystem™
Before pictures show slag build up on leading edges of superheat pendants.
After SHOCKSystem™
After pictures show the SHOCKSystem™ has begun to remove slag build up on leading edges of superheat pendants.
<
Primary Superheat Demonstration
Shock Stories Index
Email us
to learn more about our next generation ash removal product.
PW Privacy Policy
|
PW Terms + Conditions
|
PW Site Map
Boiler Cleaning News
SHOCKSystem™ Receives Gold CQIA Designation
AEP Rockport Purchases Second SHOCKSystem™
EnergyTech: SHOCKSystem™ Reduces Erosion (PDF)
Energy Central: Backpass Cleaning Comparison (PDF)
Power: Harnessing Detonation Waves (PDF)
EnergyTech: Advanced Sootblower Technologies (PDF)
Power: Shockingly Clean Boiler (PDF)
[ Boiler Cleaning News Archive ]
Shock Literature
White Paper: Tube Erosion
Detonation-Based Online Cleaning
Comparison: Acoustic Horn vs SHOCKSystem™
Comparison: Sootblower vs SHOCKSystem™
Meets Local, State and National Safety Regulations
[ Literature Archive ]
Shock Stories
Backpass Ash Platenization Removal
Economizer Demonstration
Economizer Demonstration
Economizer Demonstration
Economizer Bridging and Platenization Removal
[ Shock Stories Index ]
Pulse Detonation News
Popular Science: After Combustion - Detonation
Flight International: Pulse Power
Aviation Week: Taking the Pulse
[ Pulse Detonation News Archive ]
Shock Video
Span shot of shock tube extending into boiler region with use of combustor bend
[mpg size: 498 KB]
Support hangers and combustor bends give the SHOCKSystem™ installation flexibility
[mpg size: 563 KB]
Shock Pics
Five-picture time-elapsed series of ash removal in boiler region.
[5 Pics]
The SHOCKSystem™ blasts through all types of ash.
[5 Pics]