The SHOCKSystem™ demonstrated ability to clean economizer tube rows, resulting in improved economizer exit gas temperatures.
SHOCK STORY: ECONOMIZER HEAT TRANSFER PERFORMANCE DEMO
Current Situation:
500+ MW boiler
Burns 100% Power River Basin (PRB) Coal
Boiler is base loaded
A decline in economizer heat transfer performance causes exit gas temperature to increase over time
Solution:
A combustor was installed between the upper and middle economizer bundle
Utilized an existing manway opening located on the left side
The penetration was 10' 6" from the right sidewall
Performance:
Removed upper economizer platenization from tube rows more than 15' from left side wall
Removed lower economizer platenization from tube rows more than 30' from left side wall
Middle economizer was not heavily platenized prior to demonstration
Analyzed ash accumulations in the hoppers before, during and after demonstration
Operation resulted in significant left side wall hopper loading; indicating successful removal of built-up ash from the left side of the economizer
Left side wall gas temperature leaving the economizer decreased by more than 50°F
SHOCKSystem's™ Bottom-Line Impact:
Demonstrated ability to clean the economizer tube rows
Showed improvement in the economizer exit gas temperature
Demonstration lead to an installation proposal
Results: SHOCKSystem™ Removed Platenization Between Tube Rows
Before SHOCKSystem™
After SHOCKSystem
™
Significant platenization can be seen between tube rows prior to use of SHOCKSystem™
Reduction in platenization between tube rows is evident after use of SHOCKSystem™
<
Economizer Ash Pile Removal
Shock Stories Index
Economizer Staggered Fin Demonstration
>
Email us
to learn more about our next generation ash removal product.
PW Privacy Policy
|
PW Terms + Conditions
|
PW Site Map
Boiler Cleaning News
SHOCKSystem™ Receives Gold CQIA Designation
AEP Rockport Purchases Second SHOCKSystem™
EnergyTech: SHOCKSystem™ Reduces Erosion (PDF)
Energy Central: Backpass Cleaning Comparison (PDF)
Power: Harnessing Detonation Waves (PDF)
EnergyTech: Advanced Sootblower Technologies (PDF)
Power: Shockingly Clean Boiler (PDF)
[ Boiler Cleaning News Archive ]
Shock Literature
White Paper: Tube Erosion
Detonation-Based Online Cleaning
Comparison: Acoustic Horn vs SHOCKSystem™
Comparison: Sootblower vs SHOCKSystem™
Meets Local, State and National Safety Regulations
[ Literature Archive ]
Shock Stories
Backpass Ash Platenization Removal
Economizer Demonstration
Economizer Demonstration
Economizer Demonstration
Economizer Bridging and Platenization Removal
[ Shock Stories Index ]
Pulse Detonation News
Popular Science: After Combustion - Detonation
Flight International: Pulse Power
Aviation Week: Taking the Pulse
[ Pulse Detonation News Archive ]
Shock Video
Span shot of shock tube extending into boiler region with use of combustor bend
[mpg size: 498 KB]
Support hangers and combustor bends give the SHOCKSystem™ installation flexibility
[mpg size: 563 KB]
Shock Pics
Five-picture time-elapsed series of ash removal in boiler region.
[5 Pics]
The SHOCKSystem™ blasts through all types of ash.
[5 Pics]