The SHOCKSystem™ successfully removed pluggage in high temperature gas lanes and ash accumulation outside of birdcage.
SHOCK STORY: HORIZONTAL REHEATER DEMONSTRATION
Current Situation:
600+ MW Boiler
Burns a blend of Powder River Basin (PRB) and Bituminous Coal
Has extreme pluggage of the gas lanes in the lower reheater tube assemblies
Pluggage reaches depths between 12 to 24 inches, causing the unit to experience significant outage and reduced capacity
Solution:
Installed a demonstration combustor on the left side wall
Utilized an existing manway opening
Performance:
Removed ash accumulation outside of birdcage
Video confirmed pluggage removed from gas lanes
Bottom-Line Impact:
Removed pluggage in high temperature gas lanes
Showed significant collection of ash on hopper grating
Lead to a proposal
Results: Removed Pluggage, Showed Significant Collection of Ash in Hopper
Before SHOCKSystem™
After SHOCKSystem™
Ash collection hopper is relatively clean prior to use of SHOCKSystem™
Ash collection hopper is full of debris after use of SHOCKSystem™
<
Economizer Staggered Fin Demo
Shock Stories Index
Horizontal Reheater Demonstration
>
Email us
to learn more about our next generation ash removal product.
PW Privacy Policy
|
PW Terms + Conditions
|
PW Site Map
Boiler Cleaning News
SHOCKSystem™ Receives Gold CQIA Designation
AEP Rockport Purchases Second SHOCKSystem™
EnergyTech: SHOCKSystem™ Reduces Erosion (PDF)
Energy Central: Backpass Cleaning Comparison (PDF)
Power: Harnessing Detonation Waves (PDF)
EnergyTech: Advanced Sootblower Technologies (PDF)
Power: Shockingly Clean Boiler (PDF)
[ Boiler Cleaning News Archive ]
Shock Literature
White Paper: Tube Erosion
Detonation-Based Online Cleaning
Comparison: Acoustic Horn vs SHOCKSystem™
Comparison: Sootblower vs SHOCKSystem™
Meets Local, State and National Safety Regulations
[ Literature Archive ]
Shock Stories
Backpass Ash Platenization Removal
Economizer Demonstration
Economizer Demonstration
Economizer Demonstration
Economizer Bridging and Platenization Removal
[ Shock Stories Index ]
Pulse Detonation News
Popular Science: After Combustion - Detonation
Flight International: Pulse Power
Aviation Week: Taking the Pulse
[ Pulse Detonation News Archive ]
Shock Video
Span shot of shock tube extending into boiler region with use of combustor bend
[mpg size: 498 KB]
Support hangers and combustor bends give the SHOCKSystem™ installation flexibility
[mpg size: 563 KB]
Shock Pics
Five-picture time-elapsed series of ash removal in boiler region.
[5 Pics]
The SHOCKSystem™ blasts through all types of ash.
[5 Pics]