Sootblowers vs. SHOCKSystem™
With lower maintenance and operations costs, and greater installation flexibility, the SHOCKSystem™ outperforms Sootblowing technology.
 
Sootblower Cleaning vs. SHOCKSystem™ Online Detonation Cleaning
Comparative highlights between technologies
Online Detonation Cleaning™Sootblower Cleaning
Ominidirectional-propagating blast waveLine-of-sight jet
Single impulse6 minute cycles
2 PSI minimumTens of PSI PIP
10 pulses repeated every 8 hours per combustor (30 cycles per day)1 cycle every 4 hours per sootblower (6 cycles per day)
Successful in continuous-maintenance mode and remedial cleaning mode – established deposits are removed as well.Used principally in continuous-maintenance mode – does not let ash accumulate or sinter on adjacent three to four tube rows.
 
The SHOCKSystem™ employs Pulse Detonation Technology
The SHOCKSystem™ Detonation Based Online Boiler Cleaning Technology is NOT a Jet-Interaction Sootblower
 
Maintenance Comparison
SHOCKSystem™ Requirements
The SHOCKSystem™ has limited moving parts
1) Replace fuel and air filters
2) Replace combustor spark plug
3) Ensure Fuel Supply is Ordered each Month
 
Sootblower Cleaning
Inspect And Replace On A Regular Basis ...
1) Blown and damaged nozzles
2) Warn and damaged carriage housing
3) Warped, melted, corroded lance tubes
4) Entangled cable and power cords
5) Worn and failed gearbox shields
6) Grooved feedtubes
7) Unaligned and broken feedtube locknut assemblies
8) Adjust blowing pressure to match boiler conditions
9) Tighten packing tensioner to eliminate leaks
Sootblower Diagram
 
Generic Operating Cost Comparison
Cost Per Single Sootblower or CombustorAir SootblowerSteam SootblowerSHOCKSystem™ Combustor
Flow Rate5100* scfm12,000* pounds/hrProprietary Info.
Cycles Per Day9927**
Cycle Time in Mintues66N/A
Operating Days per Year310310310
Usage Cost.0005/scf*$5/ton$.14/detonation
Make-up Water CostN/A$2/1000 gallonsN/A
Cost per Cycle$15.30$3.30$.14
Cost per Day$138$30$4.20
Annual Operating Cost$42,000$9,177$1,302
*Clyde Bergermann data    **Number of shots may vary depending on ash deposit strength
 
AEP Rockport Actual Operation Cost Comparison
 Steam SootblowerSHOCKSystem™ Combustor
Flow Rate/Blower12,000* pounds/hrProprietary Info.
Cycles Per Day/Blower211
Minutes/Cycle/Blower20N/A
Operating Days per Year310310
Fuel Cost$5/ton coal*$0.14/detonation
Make-up Water Cost$2/1000 gallonsN/A
Cost per Cycle/Blower$10.96$0.14
Cost per Day/Blower$22$1.54
Annual Cost/Blower$6,798$477
 Four 4 SootblowersFor 5 Combustors
Total Annual Cost$27,190$2,387
*Clyde Bergermann data    # Rockport
 
AEP Rockport: Area to Clean
The "Area to Clean" is inaccessible to sootblowers; however the problem region can be easily accessed by the SHOCKSystem™ bent tube configuration installation.
Rockport U2 Economizer

4 Steam Sootblowers:
2 on North side wall
2 on South side wall

5 SHOCKSystem™ Combustors:
All five combustors located along front wall, with direct access to problem region.
Economic Benefits
Cost of operating five SHOCKSystem™ combustors at AEP Rockport is 91% lower than cost of operating four steam sootblowers located above the middle economizer bundle.
 
Installation Flexibility
SHOCKSystem™
- SHOCKSystem™ can be installed along any boiler wall
- SHOCKSystem™ can bend, turn and avoid any obstacles
- Bent tube configuration requires less than 10' space from boiler wall
- Nested tube configuration offer another method of minimizing footprint
- Straight tube configuration can be placed in existing sootblower locations
 
Bent tube ConfigurationNested tube configurationStraight tube configuration
SHOCKSystem™ bent tube configurationSHOCKSystem™ nested tube configurationSHOCKSystem™ straight tube configuration
Requires less than 10' of space, allowing installation in tight quartersTwo nested combustors can be installed in less than 10' of spaceStraight tube configuration requires less than 15' of installation space
 
SHOCKSystem™ Installations vs. Sootblowers
Installation Benefits
The SHOCKSystem™ has multiple installation configurations that allow the flexibility to install on any boiler wall to combat fouling and fly-ash accumulation
 
 
  Email us to learn more about our next generation ash removal product.
 
 
 
 
  Boiler Cleaning News
    SHOCKSystem™ Receives Gold CQIA Designation
    AEP Rockport Purchases Second SHOCKSystem™
    EnergyTech: SHOCKSystem™ Reduces Erosion (PDF)
    Energy Central: Backpass Cleaning Comparison (PDF)
    Power: Harnessing Detonation Waves (PDF)
    EnergyTech: Advanced Sootblower Technologies (PDF)
    Power: Shockingly Clean Boiler (PDF)
    [ Boiler Cleaning News Archive ]
 
  Shock Literature
    White Paper: Tube Erosion
    Detonation-Based Online Cleaning
    Comparison: Acoustic Horn vs SHOCKSystem™
    Comparison: Sootblower vs SHOCKSystem™
    Meets Local, State and National Safety Regulations
    [ Literature Archive ]
 
  Shock Stories
    Backpass Ash Platenization Removal
    Economizer Demonstration
    Economizer Demonstration
    Economizer Demonstration
    Economizer Bridging and Platenization Removal
    [ Shock Stories Index ]
 
  Pulse Detonation News
    Popular Science: After Combustion - Detonation
    Flight International: Pulse Power
    Aviation Week: Taking the Pulse
    [ Pulse Detonation News Archive ]
 
  Shock Video
 
 
 
 
  Shock Pics